National systems/en: Difference between revisions
Jump to navigation
Jump to search
(Updating to match new version of source page) |
(Updating to match new version of source page) |
||
Line 1: | Line 1: | ||
<languages /> | <languages /> | ||
==Compute== | ==Compute== | ||
Line 16: | Line 6: | ||
===Overview=== | ===Overview=== | ||
Cedar(GP2) and Graham(GP3) are | Cedar (GP2) and Graham (GP3) are similar systems with some differences in interconnect and the number of large memory, small memory and GPU nodes. | ||
{| class="wikitable" | {| class="wikitable" | ||
Line 27: | Line 17: | ||
|| OpenStack IAAS Cloud || 7,640 cores || In production<br /> (integrated with west.cloud) | || OpenStack IAAS Cloud || 7,640 cores || In production<br /> (integrated with west.cloud) | ||
|- | |- | ||
| [[ | | [[Cedar|Cedar (GP2)]] || | ||
heterogeneous, general-purpose cluster | heterogeneous, general-purpose cluster | ||
* Serial and small parallel jobs | * Serial and small parallel jobs | ||
Line 34: | Line 24: | ||
|| 27,696 cores || In production | || 27,696 cores || In production | ||
|- | |- | ||
| [[ | | [[Graham|Graham (GP3)]] || | ||
heterogeneous, general-purpose cluster | heterogeneous, general-purpose cluster | ||
* Serial and small parallel jobs | * Serial and small parallel jobs | ||
Line 46: | Line 36: | ||
|| Approx 40,000 cores || RFP closes in May, 2018 | || Approx 40,000 cores || RFP closes in May, 2018 | ||
|- | |- | ||
| [[ | | [[Niagara|Niagara (LP)]] || | ||
homogeneous, large parallel cluster | homogeneous, large parallel cluster | ||
* Designed for large parallel jobs > 1000 cores | * Designed for large parallel jobs > 1000 cores | ||
|| | || 60,000 cores || In production | ||
|} | |} | ||
All systems have large, high-performance attached storage. See [[National Data Cyberinfrastructure]] | |||
for an overview; follow the links above for individual system for details. | |||
==CCDB descriptions== | |||
General descriptions are also available on CCDB: | |||
* [https://ccdb.computecanada.ca/resources/Graham-Compute Cedar-Compute] | |||
* [https://ccdb.computecanada.ca/resources/Cedar-GPU Cedar-GPU] | |||
* [https://ccdb.computecanada.ca/resources/Graham-Compute Graham-Compute] | |||
* [https://ccdb.computecanada.ca/resources/Graham-GPU Graham-GPU] | |||
* [https://ccdb.computecanada.ca/resources/NDC-SFU NDC-SFU] | |||
* [https://ccdb.computecanada.ca/resources/NDC-Waterloo NDC-Waterloo] | |||
[[Category:Migration2016]] | [[Category:Migration2016]] |
Revision as of 14:35, 7 February 2019
Compute
Overview
Cedar (GP2) and Graham (GP3) are similar systems with some differences in interconnect and the number of large memory, small memory and GPU nodes.
Name | Description | Capacity | Status |
---|---|---|---|
CC-Cloud Resources
Arbutus/west.cloud (GP1) |
OpenStack IAAS Cloud | 7,640 cores | In production (integrated with west.cloud) |
Cedar (GP2) |
heterogeneous, general-purpose cluster
|
27,696 cores | In production |
Graham (GP3) |
heterogeneous, general-purpose cluster
|
33,376 cores | In production |
GP4 |
heterogeneous, general-purpose cluster
|
Approx 40,000 cores | RFP closes in May, 2018 |
Niagara (LP) |
homogeneous, large parallel cluster
|
60,000 cores | In production |
All systems have large, high-performance attached storage. See National Data Cyberinfrastructure for an overview; follow the links above for individual system for details.
CCDB descriptions
General descriptions are also available on CCDB: