Translations:Running jobs/156/en: Difference between revisions
Jump to navigation
Jump to search
(Importing a new version from external source) |
(Importing a new version from external source) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
<tab name="Beluga"> | <tab name="Beluga"> | ||
On Beluga, no jobs are permitted longer than 168 hours (7 days) and there is a limit of 1000 jobs, queued and running, per user. Production jobs should have a duration of at least an hour. | On Beluga, no jobs are permitted longer than 168 hours (7 days) and there is a limit of 1000 jobs, queued and running, per user. Production jobs should have a duration of at least an hour. | ||
</tab> | </tab> | ||
<tab name="Cedar"> | <tab name="Cedar"> | ||
Jobs may not be submitted from directories on the /home filesystem on Cedar; the maximum duration for a job is 28 days. This is to reduce the load on that filesystem and improve the responsiveness for interactive work. If the command <code>readlink -f $(pwd) | cut -d/ -f2</code> returns <code>home</code>, you are not permitted to submit jobs from that directory. Transfer the files from that directory either to a /project or /scratch directory and submit the job from there. | Jobs may not be submitted from directories on the /home filesystem on Cedar; the maximum duration for a job is 28 days. This is to reduce the load on that filesystem and improve the responsiveness for interactive work. If the command <code>readlink -f $(pwd) | cut -d/ -f2</code> returns <code>home</code>, you are not permitted to submit jobs from that directory. Transfer the files from that directory either to a /project or /scratch directory and submit the job from there. | ||
</tab> |
Latest revision as of 20:43, 9 August 2023
<tabs>
On Beluga, no jobs are permitted longer than 168 hours (7 days) and there is a limit of 1000 jobs, queued and running, per user. Production jobs should have a duration of at least an hour.
Jobs may not be submitted from directories on the /home filesystem on Cedar; the maximum duration for a job is 28 days. This is to reduce the load on that filesystem and improve the responsiveness for interactive work. If the command readlink -f $(pwd) | cut -d/ -f2
returns home
, you are not permitted to submit jobs from that directory. Transfer the files from that directory either to a /project or /scratch directory and submit the job from there.