National systems: Difference between revisions
Jump to navigation
Jump to search
m (→Compute) |
m (→Compute) |
||
Line 14: | Line 14: | ||
<tr><td>[[GP2]]</td><td>general-purpose cluster (serial and small parallel jobs)</td><td align="center">25,000 cores</td><td>February, 2017</td></tr> | <tr><td>[[GP2]]</td><td>general-purpose cluster (serial and small parallel jobs)</td><td align="center">25,000 cores</td><td>February, 2017</td></tr> | ||
<tr><td>[[GP3]]</td><td>general-purpose cluster (serial and small parallel jobs)</td><td align="center">25,000 cores</td><td>May, 2017</td></tr> | <tr><td>[[GP3]]</td><td>general-purpose cluster (serial and small parallel jobs)</td><td align="center">25,000 cores</td><td>May, 2017</td></tr> | ||
<tr><td>[[LP]]</td><td>a cluster designed for large parallel jobs</td><td>60,000 cores</td><td>Summer, 2017</tr> | <tr><td>[[LP]]</td><td>a cluster designed for large parallel jobs</td><td align="center">60,000 cores</td><td>Summer, 2017</tr> | ||
<tr><td>[[Available software]]</td></tr> | <tr><td>[[Available software]]</td></tr> | ||
</table> | </table> |
Revision as of 19:21, 20 October 2016
Sharing: Public | Early Draft | Author:CC Migration team |
Introduction
TBD - detailed docs for the new systems are being written by the Research Support National Team.
Compute
Name | Description | Approximate Capacity | Availability |
CC-Cloud Resources | cloud | 7,640 cores | In production (integrated with west.cloud) |
GP2 | general-purpose cluster (serial and small parallel jobs) | 25,000 cores | February, 2017 |
GP3 | general-purpose cluster (serial and small parallel jobs) | 25,000 cores | May, 2017 |
LP | a cluster designed for large parallel jobs | 60,000 cores | Summer, 2017 |
Available software |
National Storage Infrastructure
The National Storage Infrastructure will have 2 components:
Object Storage |
A fully distributed object storage system spanning all 4 sites, with geo-redundancy, replication and universal access. |
Long-term File Storage |
Long-term file storage sites (similar to Silo) at SFU and the University of Waterloo. Each site will have tape backup. |
- Patrick Mann (talk) 16:43, 20 October 2016 (UTC) Storage Building Blocks have been delivered and are being installed.
- Patrick Mann (talk) 15:26, 23 September 2016 (UTC) Note that due to Silo decommissioning Dec.31/2016 it will be necessary to provide interim storage while the NSI is developed. See Migration2016:Silo for details.