GP3 (Waterloo)

GP3 system evaluation is not yet completed (as of early November 2016). Anticipated specifications, based on Waterloo's RFP and bids received, include the following. This information is NOT GUARANTEED and might not be complete. It is provided for planning purposes.

The parallel filesystem, interconnects and external persistent storage will be the same as GP2.

Node types and characteristics

"Base" compute nodes Over 500 nodes 128GB of memory each
"Large" compute nodes Over 100 nodes 256GB of memory each
"Bigmem512" nodes TBD 512GB of memory each
"Bigmem3000" nodes TBD 3 TB of memory each

All of the above nodes will have local (on-node) storage.

Compute Canada is not currently able to disclose the specific CPU model or specifications.

GP3 will have GPU's, but Compute Canada is not currently able to disclose specific details. The RFP used NVIDIA K80 as a baseline specification.

The total GP3 system is anticipated to have over 25,000 cores.

The delivery and installation schedule is not yet known.