National systems: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
(Remove transclusions: Too large, page structure was lost) |
||
Line 31: | Line 31: | ||
|| OpenStack IAAS Cloud || 7,640 cores || In production<br /> (integrated with west.cloud) | || OpenStack IAAS Cloud || 7,640 cores || In production<br /> (integrated with west.cloud) | ||
|- | |- | ||
| [[ | | [[Cedar|Cedar (GP2)]] || | ||
heterogeneous, general-purpose cluster | heterogeneous, general-purpose cluster | ||
* Serial and small parallel jobs | * Serial and small parallel jobs | ||
Line 38: | Line 38: | ||
|| 27,696 cores || In production | || 27,696 cores || In production | ||
|- | |- | ||
| [[ | | [[Graham|Graham (GP3)]] || | ||
heterogeneous, general-purpose cluster | heterogeneous, general-purpose cluster | ||
* Serial and small parallel jobs | * Serial and small parallel jobs | ||
Line 50: | Line 50: | ||
|| Approx 40,000 cores || RFP closes in May, 2018 | || Approx 40,000 cores || RFP closes in May, 2018 | ||
|- | |- | ||
| [[ | | [[Niagara|Niagara (LP)]] || | ||
homogeneous, large parallel cluster | homogeneous, large parallel cluster | ||
* Designed for large parallel jobs > 1000 cores | * Designed for large parallel jobs > 1000 cores | ||
Line 57: | Line 57: | ||
<!--T:5--> | <!--T:5--> | ||
All systems have large, high-performance attached storage. See [[National Data Cyberinfrastructure]] | |||
for an overview; follow the links above for individual system for details. | |||
</translate> | </translate> | ||
[[Category:Migration2016]] | [[Category:Migration2016]] |
Revision as of 16:07, 6 February 2019
CCDB Descriptions[edit]
General descriptions are also available on CCDB:
Compute[edit]
Overview[edit]
Cedar(GP2) and Graham(GP3) are almost identical systems with some minor differences in the actual mix of large memory, small memory and GPU nodes.
Name | Description | Capacity | Status |
---|---|---|---|
CC-Cloud Resources
Arbutus/west.cloud (GP1) |
OpenStack IAAS Cloud | 7,640 cores | In production (integrated with west.cloud) |
Cedar (GP2) |
heterogeneous, general-purpose cluster
|
27,696 cores | In production |
Graham (GP3) |
heterogeneous, general-purpose cluster
|
33,376 cores | In production |
GP4 |
heterogeneous, general-purpose cluster
|
Approx 40,000 cores | RFP closes in May, 2018 |
Niagara (LP) |
homogeneous, large parallel cluster
|
~60,000 cores | Vendor negotiations |
All systems have large, high-performance attached storage. See National Data Cyberinfrastructure for an overview; follow the links above for individual system for details.