National systems: Difference between revisions
Jump to navigation
Jump to search
m (trivial paste-o) |
No edit summary |
||
Line 32: | Line 32: | ||
Note that GP1, GP2 and LP will all have large, high-performance attached storage. | Note that GP1, GP2 and LP will all have large, high-performance attached storage. | ||
{{GP2}} | |||
{ | {{GP3}} | ||
==National Data Cyberinfrastructure (NDC)== | ==National Data Cyberinfrastructure (NDC)== |
Revision as of 17:38, 7 November 2016
Sharing: Public | New Systems | Author:CC Migration team |
Compute
Overview
GP2 and GP3 are almost identical systems with some minor differences in the actual mix of large memory, small memory and GPU nodes.
Name | Description | Approximate Capacity | Availability |
---|---|---|---|
CC-Cloud Resources (GP1) | Cloud | 7,640 cores | In production (integrated with west.cloud) |
GP2 |
heterogeneous, general-purpose cluster
|
25,000 cores | April, 2017 |
GP3 |
heterogeneous, general-purpose cluster
|
25,000 cores | April, 2017 |
LP | a cluster designed for large parallel jobs | 60,000 cores | Late 2017 |
Note that GP1, GP2 and LP will all have large, high-performance attached storage.
National Data Cyberinfrastructure (NDC)
Type | Location | Capacity | Availability | Comments |
---|---|---|---|---|
Nearline (Long-term) File Storage |
SFU and Waterloo
|
15 PB each | Late Autumn 2016 |
|
Object Store |
All 4 sites
|
Small to start (A few PB usable) |
Late 2017 |
|
Special Purpose | various | ~3.5 PB | Specialized migration plans |
|
Note that due to Silo decommissioning Dec.31/2016 it will be necessary to provide interim storage while the NDC is developed. See Migration2016:Silo for details.