GP4

From Alliance Doc
Revision as of 20:52, 11 December 2017 by Stubbsda (talk | contribs)
Jump to navigation Jump to search

Introduction[edit]

GP4 is the final acquisition through the CFI Cyberinfrastructure Challenge 2 program. It will be a general purpose cluster whose basic architecture is similar to that of Cedar and Graham and will be located at a Calcul Québec datacentre. It is in still in an early design stage and is expected to be delivered in early summer of 2018 and in production by the autumn of that year.