Translations:Gaussian error messages/2/en

From Alliance Doc
Revision as of 14:46, 12 March 2018 by FuzzyBot (talk | contribs) (Importing a new version from external source)
Jump to navigation Jump to search

Normal termination of Gaussian XX

Normally Gaussian will terminate with a line such as

 Job cpu time:       0 days  0 hours 26 minutes 18.3 seconds.
 Elapsed time:       0 days  0 hours  6 minutes 43.3 seconds.
 Normal termination of Gaussian 16 at Tue Nov 14 15:31:56 2017.

If a job fails without producing an error message, and the output otherwise looks normal, it usually means that the job exceeded the time requested from the scheduler (--time=HH:MM:SS), or exceeded the memory requested (--mem=), or your disk quota was exceeded.