Cedar
Cedar (GP2)
CEDAR is a heterogeneous cluster, suitable for a variety of workloads, located at Simon Fraser University. It is named for the Western Red Cedar, B.C.’s official tree and of great spiritual significance to the region's First Nations people. It was previously known as "GP2" and is still identified as such in the 2017 RAC documentation.
System evaluation is not yet completed as of November 2016. Anticipated specifications, based on SFU's RFP and bids received, include the following. This information is not guaranteed and might not be complete. It is provided for planning purposes.
Système de stockage
$HOME |
Standard home directory |
$SCRATCH Parallel High-performance filesystem |
Approximately 4PB usable capacity for temporary ( |
$PROJECT External persistent storage |
Provided by the NDC. |
High performance interconnect |
Low-latency high-performance fabric connecting all nodes and temporary storage. |
Types de noeuds et leurs caractéristiques
Noeuds de calcul de base: | Plus de 500 noeuds | 128 Go de mémoire, 16 coeurs/socket, 2 sockets/noeud |
Noeuds de calcul de type "large": | Plus de 100 noeuds | 256 Go de mémoire, 16 coeurs/sockets, 2 sockets/noeud |
Noeuds à grande mémoire 512 | 24 noeuds | 512 Go de mémoire, 16 coeurs/socket, 2 sockets/noeud |
Noeuds à grande mémoire 1500 | 24 noeuds | 1.5 To de mémoire, 16 coeurs/socket, 2 sockets/noeud |
Noeuds GPU de base | Plus de 100 noeuds | 128 Go de mémoire, 12 coeurs/socket, 2 sockets/noeud, 4 GPUs/noeud, 2 GPUs/socket. |
Noeuds GPU "large" | Environ 30 noeuds | 256 Go de mémoire, 12 coeurs/socket, 2 sockets/noeud, 4 GPUs/noeud, Tous les GPUs sur le même socket |
Noeuds à grande mémoire 3000 | 4 noeuds | 3 To de mémoire, 8 coeurs/socket, 4 sockets/noeud |
Tous les noeuds ci-dessus auront du stockage local.
Calcul Canada n'est présentement pas en mesure de spécifier le modèle de GPU. L'appel d'offre utilisait des NVidia K80 comme minimum.
The completed system is expected to have over 25,000 cores, 900 nodes, and 500 GPUs.
L'horaire de livraison et d'installation n'est pas encore déterminé. L'équipe d'acquisition est confiante que le système sera en production au début de l'année d'allocation, le 1er avril 2017.