Trillium: Difference between revisions

m
no edit summary
mNo edit summary
mNo edit summary
Line 18: Line 18:
The Trillium cluster will be deployed in the spring of 2025.   
The Trillium cluster will be deployed in the spring of 2025.   


This cluster, built by Lenovo, will consist of:
This cluster, built by Lenovo Canada, will consist of:


* 1,224 CPU nodes, each with
* 1,224 CPU nodes, each with
Line 34: Line 34:
** Fully non-blocking, meaning every node can talk to every other node at full bandwidth simultaneously.
** Fully non-blocking, meaning every node can talk to every other node at full bandwidth simultaneously.


* Parallel storage: 29 petabytes, all-flash, from Vast Data.
* Parallel storage: 29 petabytes, NVMe SSD based storage from VAST Data.
</translate>
</translate>
cc_staff
150

edits