Translations:META-Farm/142/en
The META package has important advantages over other approaches like GLOST where farm processing is done by bundling up all the jobs into a large parallel (MPI) job:
- As the scheduler has full flexibility to start individual metajobs when it wants, the queue wait time can be dramatically shorter with the META package than with GLOST. Consider a large farm where 1000 CPU cores need to be used for 3 days;
- with GLOST, with a 1000-way MPI job, queue wait time can be weeks, so it'll be weeks before you see your very first result;
- with META, some metajobs start to run and produce the first results within minutes.
- At the end of the farm computations;
- with GLOST, some MPI ranks will finish earlier and will sit idle until the very last—the slowest—MPI rank ends;
- with META, there is no such waste at the end of the farm: individual metajobs exit earlier if they have no more workload to process.
- GLOST and other similar packages do not support automated resubmission of the cases which failed or never ran. META has this feature, and it is very easy to use.