Advanced MPI scheduling
This is not a complete article: This is a draft, a work in progress that is intended to be published into an article, which may or may not be ready for inclusion in the main wiki. It should not necessarily be considered factual or authoritative.
Most users should submit MPI or distributed memory parallel jobs following the example
given at Running jobs. Simply request a number of
processes with --ntasks
or -n
and trust the scheduler
to allocate those processes in a way that balances the efficiency of your job
with the overall efficiency of the cluster.
If you want more control over how your job is allocated, then SchedMD's
page on multicore support is a good
place to begin. It describes how many of the options to the
sbatch
command interact to constrain the placement of processes.
You may find this discussion of What exactly is considered a CPU? in SLURM to be useful.
Examples of common MPI scenarios[edit]
--ntasks=15 --mem-per-cpu=3G srun application.exe
This will run 15 MPI processes. The cores could be allocated anywhere in the cluster. Since we don’t know a priori how many cores will reside on each node, if we want to specify memory, it should be done by per-cpu.
If for some reason we need all cores in a single node (to avoid communication overhead, for example), then
--nodes=1 --tasks-per-node=15 --mem=45G srun application.exe
will give us what we need. In this case we could also say --mem-per-cpu=3G
. The main difference is that with --mem-per-cpu=3G
, the job will be canceled if any of the processes exceeds 3GB, while with --mem=45G
, the memory consumed by each individual process doesn't matter, as long as all of them together don’t use more than 45GB.
Hybrid jobs: MPI and OpenMP, or MPI and threads[edit]
--ntasks=16 --cpus-per-task=4 --mem-per-cpu=3G srun application.exe
In this example a total of 64 cores will be allocated, but only 16 MPI processes (tasks) can and will be initialized. If the application is also OpenMP, then each process will spawn 4 threads, one per core. Each process will be allocated with 12GB of memory. The tasks, in groups of 4 cores each, could be allocated anywhere, from 2 to up to 16 nodes.
--nodes=4 --tasks-per-node=4 --cpus-per-task=4 --mem=48G srun application.exe
This job is the same size as the one immediately above: 16 tasks (that is, 16 MPI processes), each with 4 threads. The difference here is that we are sure of getting exactly 4 tasks on 4 different nodes. Recall that --mem
requests memory per node, so we can use it instead of --mem-per-cpu
for the reason described earlier.
MPI and GPUs[edit]
To come
Troubleshooting and performance monitoring[edit]
To come
Why srun instead of mpiexec or mpirun?[edit]
mpirun
is a wrapper that enables communication between processes running on different machines. Modern schedulers already provide many things that mpirun
needs. With Torque/Moab, for example, there is no need to pass to mpirun
the list of nodes on which to run, or the number of processes to launch; this is done automatically by the scheduler. With Slurm, the task affinity is also resolved by the scheduler, so there is no need to specify things like
mpirun --map-by node:pe=4 -n 16 application.exe
As implied in the examples above, srun application.exe
will automatically distribute the processes to precisely the resources allocated to the job.
In programming terminology, srun
is higher level of abstraction than mpirun
. Anything that can be done with mpirun
can be done with srun
, and more. It is the tool in Slurm to distribute any kind of computations. It replaces Torque’s pbsdsh
, for example, and much more. Think of srun
as the SLURM "all-around parallel-tasks distributor"; once a particular set of resources is allocated, the nature of your application doesn't matter (MPI, OpenMP, hybrid, serial farming, pipelining, multi-program, etc.), you just have to srun
it
Also, as you would expect, srun
is fully coupled to Slurm. When you srun
an application, a "job step" is started, the environment variables SLURM_STEP_ID
and SLURM_PROCID
are initialized correctly, and correct accounting information is recorded.