Translations:Infrastructure renewal/29/en

Revision as of 22:22, 28 October 2024 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Start Time End Time System Description
Nov 7, 2024 Nov 8, 2024 (1 day) Niagara All systems and storage located at the SciNet Datacenter (Niagara, Mist, HPSS, Rouge, Teach, JupyterHub, Balam) will be unavailable from 7 a.m. to 5 p.m. ET. This outage is required to install new electrical equipment (UPS) for the upcoming systems refresh. The work is expected to be completed in one day. The scheduler will hold jobs that cannot finish before the start of the shutdown. Users are encouraged to submit small and short jobs that can take advantage of this, as the scheduler may be able to fit these jobs in before the maintenance on otherwise idle nodes.
Nov 7, 2024 6am PST Nov 8, 2024 6am PST Cedar Cedar compute nodes will be unavailable during this period (jobs will not run). Cedar login nodes and storage, as well as Cedar cloud will remain online and are not affected by this work.