Graham
Graham (GP3)
GRAHAM is a heterogeneous cluster, suitable for a variety of workloads, and located at the University of Waterloo. It is named after Wes Graham, the first director of the Computing Centre at Waterloo. It was previously known as "GP3" and is still identified as such in the 2017 RAC documentation.
System evaluation is not yet completed as of November 2016. Anticipated specifications, based on Waterloo's RFP and bids received, include the following. This information is NOT GUARANTEED and might not be complete. It is provided for planning purposes.
The parallel filesystem, interconnects and external persistent storage (NDC-Waterloo) will be the same as Cedar's. There is a slightly different mix of compute nodes.
Attached Storage System
$HOME |
Standard home directory |
$SCRATCH Parallel High-performance filesystem |
DDN storage subsystem with approximately 3PB usable capacity for temporary ( |
$PROJECT External persistent storage |
Provided by the NDC. |
High Performance Interconnect
A low-latency high-performance fabric connecting all nodes and temporary storage.
The design of Graham is to support multiple simultaneous parallel jobs of up to 1024 cores in a fully non-blocking manner.
Node types and characteristics
"Base" compute nodes | 800 nodes | 16 cores/socket, 2 sockets/node, 128 GB of memory. |
"Bigmem512" nodes | 24 nodes | 16 cores/socket, 2 sockets/node, 512 GB of memory. |
"Bigmem3000" nodes | 3 nodes | 16 cores/socket, 4 sockets/node, 3 TB of memory. |
"GPU" nodes | 160 nodes | 16 cores/socket, 2 sockets/node, 128 GB of memory, 2 NVIDIA P100 GPUs. |
"Large" nodes | 56 nodes | 16 cores/socket, 2 sockets/node, 256 GB of memory. |
All of the above nodes will have local (on-node) storage ranging from 300GB to 960GB SATA SSD drives.
Compute Canada is not currently able to disclose the specific CPU models or specifications.
Graham will have GPU's, but Compute Canada is not currently able to disclose specific details. The RFP used NVIDIA K80 as a baseline specification.
The completed system is expected to have around 35,000 cores.
The delivery and installation schedule is not yet confirmed.