Rorqual/en: Difference between revisions

From Alliance Doc
Jump to navigation Jump to search
(Updating to match new version of source page)
No edit summary
 
(8 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<languages />
<languages />


La grappe Rorqual sera déployée au cours de l'hiver 2025 et sera composée de:  
{| class="wikitable"
|-
| Availability: <i>to be determined</i>
|-
| Login node: <i>to be determined</i>
|-
| Globus endpoint: <i>to be determined</i>
|-
| Data transfer node (rsync, scp, sftp ...): <i>to be determined</i>
|-
| Portal: <i>to be determined</i>
|}


* 670 noeuds CPU  
The Rorqual cluster will be deployed in the winter of 2025. It is made up of 
** Processeurs AMD EPYC de 4e génération, 96 coeurs x 2 sockets (192 coeurs par noeud)
 
** 768Go de mémoire DDR5
* 670 CPU nodes
** 480Go de stockage SSD SATA 6Gbps
** AMD EPYC 4th generation processors, 96 cores x 2 sockets (192 cores per node)
* 8 noeuds à grande mémoire
** 768GB of DDR5 memory
** Identiques aux <i>noeuds CPU</i>, mais avec 3072Go de mémoire DDR5
** 480GB of SATA-6Gbps SSD storage space
* 8 noeuds à grand stockage
* 8 large memory nodes
** Identiques aux <i>noeuds CPU</i>, mais avec 3.84To de stockage NVMe
** same as the CPU nodes, but with 3072GB of DDR5 memory
* 81 noeuds GPU
* 8 large storage nodes
** 4 x NVIDIA H100 80Go SXM5
** same as the CPU nodes, but with 3.84TB NVMe of storage space
** Processeurs Intel Xeon Scalable de 4e génération, 32 coeurs x 2 sockets (64 coeurs par noeud)
* 81 GPU nodes
** 512Go de mémoire DDR5
** 4 x NVIDIA H100 SXM5 80GB
** 3.84To de stockage NVMe
** Intel Xeon Scalable 4th generation processors, 32 cores x 2 sockets (64 cores per node)
* Réseautique InfiniBand
** 512GB of DDR5 memory
** HDR 200Go/s
** 3.84TB of NVMe storage space
** Facteur de blocage maximum: 34:6 or 5.667:1
* InfiniBand interconnect
* Stockage parallèle: plusieurs peta-octets! <i>(détails à venir)</i>
** 200GB/s HDR 
** maximum blocking factor of 34:6 or 5.667:1
* Parallel storage: several petabytes <i>(details to come)</i>

Latest revision as of 18:57, 6 November 2024

Other languages:
Availability: to be determined
Login node: to be determined
Globus endpoint: to be determined
Data transfer node (rsync, scp, sftp ...): to be determined
Portal: to be determined

The Rorqual cluster will be deployed in the winter of 2025. It is made up of

  • 670 CPU nodes
    • AMD EPYC 4th generation processors, 96 cores x 2 sockets (192 cores per node)
    • 768GB of DDR5 memory
    • 480GB of SATA-6Gbps SSD storage space
  • 8 large memory nodes
    • same as the CPU nodes, but with 3072GB of DDR5 memory
  • 8 large storage nodes
    • same as the CPU nodes, but with 3.84TB NVMe of storage space
  • 81 GPU nodes
    • 4 x NVIDIA H100 SXM5 80GB
    • Intel Xeon Scalable 4th generation processors, 32 cores x 2 sockets (64 cores per node)
    • 512GB of DDR5 memory
    • 3.84TB of NVMe storage space
  • InfiniBand interconnect
    • 200GB/s HDR
    • maximum blocking factor of 34:6 or 5.667:1
  • Parallel storage: several petabytes (details to come)