Rorqual/en: Difference between revisions
Jump to navigation
Jump to search
(Created page with "{| class="wikitable" |- | Availability: à déterminer |- | Login node: à déterminer |- | Globus endpoint: à déterminer |- | Data transfer node (rsync, scp, sftp, etc.): à déterminer |- | Portal: à déterminer |}") |
No edit summary |
||
Line 3: | Line 3: | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
| Availability: | | Availability: <i>to be determined</i> | ||
|- | |- | ||
| Login node: | | Login node: <i>to be determined</i> | ||
|- | |- | ||
| Globus endpoint: | | Globus endpoint: <i>to be determined</i> | ||
|- | |- | ||
| Data transfer node (rsync, scp, sftp, etc.): | | Data transfer node (rsync, scp, sftp, etc.): <i>to be determined</i> | ||
|- | |- | ||
| Portal: | | Portal: <i>to be determined</i> | ||
|} | |} | ||
Revision as of 17:15, 31 October 2024
Availability: to be determined |
Login node: to be determined |
Globus endpoint: to be determined |
Data transfer node (rsync, scp, sftp, etc.): to be determined |
Portal: to be determined |
The Rorqual cluster will be deployed in the winter of 2025. It is made up of
- 670 CPU nodes
- AMD EPYC 4th generation processors, 96 cores x 2 sockets (192 cores per node)
- 768GB of DDR5 memory
- 480GB of SATA-6Gbps SSD storage space
- 8 large memory nodes
- same as the CPU nodes, but with 3072GB of DDR5 memory
- 8 large storage nodes
- same as the CPU nodes, but with 3.84TB NVMe of storage space
- 81 GPU nodes
- 4 x NVIDIA H100 SXM5 80GB
- Intel Xeon Scalable 4th generation processors, 32 cores x 2 sockets (64 cores per node)
- 512GB of DDR5 memory
- 3.84TB of NVMe storage space
- InfiniBand interconnect
- /s HDR
- maximum blocking factor of 34:6 or 5.667:1
- Parallel storage: several petabytes (details to come)