Allocations and compute scheduling: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 386: Line 386:
The time series histogram in the figure panel shows the usage time series for a single system over a specified time interval. By default the page begins by displaying the Cedar system over the past 30 days. The "System" pull down menu contains entries for each of the currently active SLURM scheduled Alliance national clusters. Specifically, Cedar, Graham, Beluga, Niagara and Narval. Selecting date bounds from the "Start date (incl.) End date (incl.)" fields will update the figure to contain usage measures from all jobs on the specified system that were in a running or pending state during the interval. Note that selecting an end date in the future will display the projection of currently running and pending jobs for their requested duration into the future.
The time series histogram in the figure panel shows the usage time series for a single system over a specified time interval. By default the page begins by displaying the Cedar system over the past 30 days. The "System" pull down menu contains entries for each of the currently active SLURM scheduled Alliance national clusters. Specifically, Cedar, Graham, Beluga, Niagara and Narval. Selecting date bounds from the "Start date (incl.) End date (incl.)" fields will update the figure to contain usage measures from all jobs on the specified system that were in a running or pending state during the interval. Note that selecting an end date in the future will display the projection of currently running and pending jobs for their requested duration into the future.
<br clear=all>
<br clear=all>
==Displaying usage over an extended time period into the future==
[[File:Slurm portal account use duration edit.png|thumb|alt=Displaying usage over and extended period into the future|Displaying usage over and extended period into the future]]
When displaying a query period that extends into the future the histogram figure window will have a transparent red area overlayed on top of the axis indicating the period of "Projection". In the period of projection the usage of all running jobs is extended to their completion time based on the time limit requested in the job submission. When displaying queued resources the projection includes the usage time series if all pending jobs started at projection begin time and ran for their requested duration.




cc_staff
55

edits