Allocations and compute scheduling: Difference between revisions

Line 389: Line 389:
==Selecting a specific cluster and time interval==
==Selecting a specific cluster and time interval==
[[File:Slurm portal select sys date.png|thumb|alt=Select a specific cluster and time interval|Select a specific cluster and time interval]]
[[File:Slurm portal select sys date.png|thumb|alt=Select a specific cluster and time interval|Select a specific cluster and time interval]]
The time series histogram in the figure panel shows the usage time series for a single system over a specified time interval. By default the page begins by displaying the Cedar system over the past 30 days. The "System" pull down menu contains entries for each of the currently active SLURM scheduled Alliance national clusters. Specifically, Cedar, Graham, Beluga, Niagara and Narval. Selecting date bounds from the "Start date (incl.) End date (incl.)" fields will update the figure to contain usage measures from all jobs on the specified system that were in a running or pending state during the interval. Note that selecting an end date in the future will display the projection of currently running and pending jobs for their requested duration into the future.
The figure shows your usage for a single cluster over a specified time interval. The "System" pull-down menu contains entries for each of the currently-active national clusters that use Slurm as a scheduler. You can use the "Start date (incl.)" and "End date (incl.)" fields in the "Select system and dates" panel to change the time interval displayed in the figure. It will include all jobs on the specified cluster that were in a running (R) or pending (PD) state during the time interval, including both the start and end date. Selecting an end date in the future will display the <i>projection</i> of currently running and pending jobs for their requested duration into the future.
<br clear=all>
<br clear=all>


Bureaucrats, cc_docs_admin, cc_staff
2,879

edits