Running jobs: Difference between revisions

Jump to navigation Jump to search
no edit summary
(add Beluga's no (7-28d] policy.)
No edit summary
Line 376: Line 376:


<!--T:91-->
<!--T:91-->
Using the <code>--array=1-100%10</code> syntax mentioned earlier one can submit a collection of identical jobs with the condition that only one job of them will run at any given time.
Using the <code>--array=1-100%10</code> syntax one can submit a collection of identical jobs with the condition that only one job of them will run at any given time.
The script should be written to ensure that the last checkpoint is always used for the next job. The number of restarts is fixed by the <code>--array</code> argument.
The script should be written to ensure that the last checkpoint is always used for the next job. The number of restarts is fixed by the <code>--array</code> argument.


Bureaucrats, cc_docs_admin, cc_staff
2,879

edits

Navigation menu