National systems: Difference between revisions

Jump to navigation Jump to search
Remove transclusions: Too large, page structure was lost
mNo edit summary
(Remove transclusions: Too large, page structure was lost)
Line 31: Line 31:
|| OpenStack IAAS Cloud || 7,640 cores || In production<br /> (integrated with west.cloud)
|| OpenStack IAAS Cloud || 7,640 cores || In production<br /> (integrated with west.cloud)
|-
|-
| [[GP2|Cedar(GP2)]] ||
| [[Cedar|Cedar (GP2)]] ||
heterogeneous, general-purpose cluster
heterogeneous, general-purpose cluster
* Serial and small parallel jobs
* Serial and small parallel jobs
Line 38: Line 38:
|| 27,696 cores || In production
|| 27,696 cores || In production
|-
|-
| [[GP3|Graham(GP3)]] ||
| [[Graham|Graham (GP3)]] ||
heterogeneous, general-purpose cluster
heterogeneous, general-purpose cluster
* Serial and small parallel jobs
* Serial and small parallel jobs
Line 50: Line 50:
|| Approx 40,000 cores || RFP closes in May, 2018
|| Approx 40,000 cores || RFP closes in May, 2018
|-
|-
| [[LP|Niagara(LP)]] ||
| [[Niagara|Niagara (LP)]] ||
homogeneous, large parallel cluster
homogeneous, large parallel cluster
* Designed for large parallel jobs > 1000 cores
* Designed for large parallel jobs > 1000 cores
Line 57: Line 57:


<!--T:5-->
<!--T:5-->
Note that GP1, GP2, GP3, GP4 and LP will all have large, high-performance attached storage.
All systems have large, high-performance attached storage. See [[National Data Cyberinfrastructure]]
 
for an overview; follow the links above for individual system for details.
<!--T:6-->
{{:Cedar}}
 
<!--T:7-->
{{:Graham}}
 
<!--T:8-->
{{:National_Data_Cyberinfrastructure}}


</translate>
</translate>


[[Category:Migration2016]]
[[Category:Migration2016]]
Bureaucrats, cc_docs_admin, cc_staff
2,915

edits

Navigation menu