RAC transition FAQ: Difference between revisions

Jump to navigation Jump to search
m
Line 11: Line 11:
* Contributed storage systems have different dates of activation and decommissioning. For these we'll be doing the SUM(2018, 2019) for quotas during the 30 days transition period.
* Contributed storage systems have different dates of activation and decommissioning. For these we'll be doing the SUM(2018, 2019) for quotas during the 30 days transition period.
* For every other PI we use default quotas
* For every other PI we use default quotas
* After the transition period, the quotas on the original sites from which data has been migrated will be set to default as well. Users are expected to delete data from those original sites as well, if the quotas are above the default. Otherwise staff will delete everything.
* After the transition period, the quotas on the original sites from which data has been migrated will also be set to default. Users are expected to delete data from those original sites as well, if the quotas are above the default. Otherwise staff will delete everything.


=== Job scheduling ===
=== Job scheduling ===
cc_staff
292

edits

Navigation menu