National systems: Difference between revisions

Jump to navigation Jump to search
no edit summary
(Niagara in production loooong ago)
No edit summary
Line 8: Line 8:


<!--T:3-->
<!--T:3-->
Cedar (GP2) and Graham (GP3) are similar systems with some differences in interconnect and the number of large memory, small memory and GPU nodes.
Cedar and Graham are similar systems with some differences in interconnect and the number of large memory, small memory and GPU nodes.


<!--T:4-->
<!--T:4-->
Line 16: Line 16:
|-
|-
| [[CC-Cloud Resources]]
| [[CC-Cloud Resources]]
Arbutus/west.cloud (GP1)<br />
Arbutus/west.cloud <br />
east.cloud
east.cloud
|| OpenStack IAAS Cloud || 7,640 cores || In production<br /> (integrated with west.cloud)
|| OpenStack IAAS Cloud || 7,640 cores || In production<br /> (integrated with west.cloud)
|-
|-
| [[Cedar|Cedar (GP2)]] ||
| [[Cedar|Cedar]] ||
heterogeneous, general-purpose cluster
heterogeneous, general-purpose cluster
* Serial and small parallel jobs
* Serial and small parallel jobs
Line 27: Line 27:
|| 27,696 cores || In production
|| 27,696 cores || In production
|-
|-
| [[Graham|Graham (GP3)]] ||
| [[Graham|Graham]] ||
heterogeneous, general-purpose cluster
heterogeneous, general-purpose cluster
* Serial and small parallel jobs
* Serial and small parallel jobs
Line 34: Line 34:
|| 33,376 cores || In production
|| 33,376 cores || In production
|-
|-
| [[GP4|GP4]] ||
| [[Béluga|Béluga]] ||
heterogeneous, general-purpose cluster
heterogeneous, general-purpose cluster
* May have GPU's, large mem, etc.
* May have GPU's, large mem, etc.
|| Approx 40,000 cores || RFP closes in May, 2018
|| Approx 40,000 cores || RFP closes in May, 2018
|-
|-
| [[Niagara|Niagara (LP)]] ||
| [[Niagara|Niagara]] ||
homogeneous, large parallel cluster
homogeneous, large parallel cluster
* Designed for large parallel jobs > 1000 cores
* Designed for large parallel jobs > 1000 cores
rsnt_translations
57,772

edits

Navigation menu